22 23 Annual Report 2025 CapitaLand Integrated Commercial Trust Value Creation E Raffles City Tower Enhancing overall user experience by refreshing key touchpoints and creation of end-of-trip facilities • Duration: 4Q 2025 to 4Q 2026 ▲ Artist’s impression of the refreshed Level 1 office lobby • Works: − Refurbish Level 1 office lobby to elevate user experience for a refreshed and spacious environment − Create end-of-trip facilities with dedicated bicycle parking and amenities for our tenants − Improve transfer floor lift lobbies and install wayfinding on all floors to tie in seamlessly with the ongoing lift enhancements ▲ Artist’s impression of the end-of-trip facilities Ongoing Upgrading Upcoming AEIs F Capital Tower Repositioning Level 9 into a community space and creating higher-yielding F&B space at ground floor • Estimated cost: S$25 million • Duration: 3Q 2026 to 4Q 2027 • Level 1 Urban Plaza Enhancement: − Development of a new 7,750 sq ft, two-storey, multi‑tenanted pavilion to elevate the overall F&B experience ▲ Artist’s impression of proposed retail pavilion at Urban Plaza − Creating an inviting landscape for tenants and public to gather, interact, and unwind in the communal space − Enhancing Capital Tower as a vibrant, tenantand-community centric landmark in the Tanjong Pagar precinct • Level 9 Reconfiguration: − Establishing CBD’s first workplace mental wellness centre for working adults and their families − Partnering with TOUCH Community Services and CapitaLand Hope Foundation under the URA's Community/Sports Facilities Scheme (CSFS) − Championing social causes and strengthening community engagement to advance well-being and social inclusivity Completed AEIs IMM Building Strengthening IMM Building’s position as a regional outlet destination • Total cost: S$48 million • Outlet Stores: >100 • Completed and handed over to tenants, income contribution started progressively from 3Q 2025 Gallileo, Frankfurt, Germany • Total cost: ~EUR180 million • Completed progressive handover of Phase 1 (office tower) to ECB in December 2025. • Target handover of phase 2: 1Q 2026 • Income contribution is progressive from 4Q 2025 ▲ Gallileo's facade ▲ Refreshed drop-off point at IMM Building ▲ Revamped F&B zone at IMM Building G
RkJQdWJsaXNoZXIy NTkwNzg=